Installation, Operation and Maintenance Manual (IOM)

Share This Post

 

I O M constitutes part of the shipping document used for installation and operation as the name suggests.

 

 I O M also lists the volume and number of consumables such as bolts, gaskets, oil that is needed for installation, operation and periodic check, servicing and maintenance.

 

 

 

Pre Commissioning & Commissioning:

Before the equipment become fully operational, it needs to be pre commissioned to see whether it is in working order and then commissioned together with a series of other equipment to see whether the whole group of equipment works in unison satisfactorily.

 

All these activities have a sequence of tests that should be followed (called I T P) and a number of checklists that need to be ticked before the equipment is declared safe (called mechanical completion) in order to initiate pre-commissioning and commissioning.

 

 

Subscribe To Our Newsletter

Get updates and learn from the best

More To Explore

Why we need Calibration?

Calibration is crucial in ensuring the accuracy of measuring instruments and equipment. It is recommended that all instruments undergo calibration annually, with some, like the coating thickness tester (DFT), being checked per shift. Radiographic films, for instance, are automatically calibrated

API Exam comes with Instant Final Scoring now

API Exam comes with Instant Final Scoring now As of April 2024; all candidates appearing for API exam shall receive instant confirmed scoring and maximum within 24 hours after exam from prometric. That is not all.   Candidates shall also

Do You Want To Boost Your knowledge?

See our Coursses