Installation, Operation and Maintenance Manual (IOM)

Share This Post

 

I O M constitutes part of the shipping document used for installation and operation as the name suggests.

 

 I O M also lists the volume and number of consumables such as bolts, gaskets, oil that is needed for installation, operation and periodic check, servicing and maintenance.

 

 

 

Pre Commissioning & Commissioning:

Before the equipment become fully operational, it needs to be pre commissioned to see whether it is in working order and then commissioned together with a series of other equipment to see whether the whole group of equipment works in unison satisfactorily.

 

All these activities have a sequence of tests that should be followed (called I T P) and a number of checklists that need to be ticked before the equipment is declared safe (called mechanical completion) in order to initiate pre-commissioning and commissioning.

 

 

Subscribe To Our Newsletter

Get updates and learn from the best

More To Explore

Inspector Continuous Improvement

  Continuous Improvement: At the completion of the inspection activities; a PDCA cycle (plan, do, check, act) review is taken as part of a continuous improvement program to determine which activities went well and where improvements should be made. Any

Maximum Allowable Working Pressure (MAWP)

  It is the maximum gauge pressure at the top of a pressure vessel allowed by design or code calculations for a set temperature. When the working temperature decreases or significantly increases, material strength is reduced and therefore the pressure

Do You Want To Boost Your knowledge?

See our Coursses