60 Second API 580 RBI Test

 

 

Risk is defined as:

A. Cost × Time
B. Probability × Consequence✅
C. Failure × Repair
D. Design × Operation

 

 

Inspection primarily reduces:

A. Consequence
B. Probability of failure✅
C. Design
D. Cost

 

 

Low PoF + High CoF results in:

A. Low risk
B. Medium risk
C. High risk✅
D. Zero risk

 

 

RBI should be updated when:

A. Never
B. Conditions/data change✅
C. Only after failure
D. Fixed schedule only

 

 

When unsure between answers, choose:

A. Fastest option
B. Cheapest option
C. Safest + most data-driven option✅
D. Random

 

 