Beginning 2023, ICP will include Continuing Professional Development (CPD) hours, as part of new recertification requirements for API 510, API 570, and API 653. The new CPD requirements are in addition to existing recertification requirements for continued inspection …
Examination specifically means QC activities such as an NDT activity. It is not an inspection. Inspection means verifying a QC activity by either witnessing it or repeating the QC activity. The closest analogy could be the difference …
Continuous Improvement: At the completion of the inspection activities; a PDCA cycle (plan, do, check, act) review is taken as part of a continuous improvement program to determine which activities went well and where improvements should be made. Any …
It is the maximum gauge pressure at the top of a pressure vessel allowed by design or code calculations for a set temperature. When the working temperature decreases or significantly increases, material strength is reduced and therefore the pressure …
CONTRACTOR shall prepare the MRB that contains all the relevant certificates, test reports, drawings, calculations relating to the CONTRACT as per vendor document requirement list (VDRL). The format and content of Manufacturing Record Book shall be in …
The bidders are short listed based on fulfilling the quality and certification requirements, acceptable engineering proposal, cost and delivery. It is always recommended to have an internal meeting between client’s package team members when short listing suppliers. …