Supplier Selection

    The bidders are short listed based on fulfilling the quality and certification requirements, acceptable engineering proposal, cost and […]

Quality Surveillance

    Prior to commencement of the quality surveillance as per Inspection and test plan (ITP) intervention points, the inspector […]

Project Quality Plan (PQP)

Project Quality Plan (PQP) is normally required for criticality “1” packages. It is based on ISO 10000 5 Quality management […]

Quality Status Report (QSR)

  QSR can be based on Procurement status report (PSR) with focus on inspection.   QSR is updated and turned […]

Preparing bid document

  Before we start preparing the paperwork for packages, let us examine the essential ingredient for bid document. A Package […]

Pre-Bid Documents

  Consists of general terms and conditions, data sheet and applicable relevant project specification.   Data sheet is one of […]

Pre-Inspection Meeting (PIM)

  PIM also called Pre-production Meeting (PPM) is normally held , 2-4 weeks after the kick off meeting or 2 […]

Packing & storage

[vc_row][vc_column][vc_column_text]   Fixed equipment is normally packed for outdoor storage for one year or as agreed with the purchaser. Rotating […]