Manufacturing Record Book (MRB)

Share This Post

 

 

CONTRACTOR shall prepare the MRB that contains all the relevant certificates, test reports, drawings, calculations relating to the CONTRACT as per vendor document requirement list (VDRL).

 

The format and content of Manufacturing Record Book shall be in accordance with the approved MRB Index.

MRB index shows the table of contents and shall be submitted by the supplier and approved by the client.

 

MRB shall be progressively compiled by the CONTRACTOR during fabrication and verified by the client’s inspector during periodic inspection visits as per Inspection and test plan (ITP).

 

CONTRACTOR shall review and endorse the contents of the MRB  prior to submission to the client for approval.

 

MRB may be endorsed by the Independent verification body (IVB); Certifying authority (CA) or Third Party Inspection (TPI) or just the client’s inspector to verify material, code or type approval requirements.

 

Subscribe To Our Newsletter

Get updates and learn from the best

More To Explore

Difference between Codes & Recommended Practices (RP)

Codes are mandatory. It is mandated by jurisdiction or the project. You can not violate or ignore a code requirement else, you are not complying with the code. For example, if a pressure vessel is built and stamped as per

Electorde polarity

When butt welding a pipeline, achieving strenght weld is crucial, a weldment with good penetration. To ensure this, connecting the electrode to the negative pole is essential. This setup generates more heat at the base metal, reducing electrode burn rate

Do You Want To Boost Your knowledge?

See our Coursses