Audit & Assessment
Depending on the criticality and complexity of the materials & equipment being procured, CLIENT and their assigned representatives may conduct...
Read Article →INSIGHTS & RESOURCES
Practical guidance for API certification, exam preparation and inspection professionals.
244 articles found
Depending on the criticality and complexity of the materials & equipment being procured, CLIENT and their assigned representatives may conduct...
Read Article →Project Quality Plan (PQP) is normally required for criticality “1” packages. It is based on ISO 10005 Quality management —...
Read Article →ISR can be based on Procurement status report (PSR) with focus on inspection. ISR is updated and turned around...
Read Article →It is a good practice to have a PSR that acts as a dashboard for procurement and fabrication activities updated...
Read Article →Each package is assigned a criticality rating; ranging from 1 through 4, with criticality ‘’1’’ being the highest. There...
Read Article →Since we are talking about the management aspect of quality assurance, quality control and inspection, the basic rules remain the...
Read Article →Before we start preparing the pre-bid paperwork for packages, let us examine the essential ingredient for pre-bid document. A...
Read Article →Before the equipment become fully operational, it needs to be pre commissioned to see whether it is in working order...
Read Article →Installation, Operation and Maintenance Manual (IOM): IOM constitutes part of the shipping document used for installation and operation...
Read Article →Explore our API, NDT and CPD training courses.