ASME Section II is divided into four parts covering the materials for the construction of piping and pressure vessels. Part A: Ferrous Material Specifications. This part contains the individual specifications for ferrous materials that are allowed in the construction …
Punch list: In theory, we expect to have a perfect package ready to be released but in reality, that is not always the case. There are times that during final check, we find a missing bolt or a localized paint …
Project Quality Plan (PQP) is normally required for criticality “1” packages. It is based on ISO 10005 Quality management — Guidelines for quality plans. It would have the same requirements as ISO 9001 QMS but intended for implementation at project level. …