Packing & storage

Fixed equipment is normally packed for outdoor storage of one year or as agreed with the purchaser.

Rotating equipment should have package suitable for outdoor storage without maintenance for a period of six months or as agreed with purchaser.

Some equipment can only packed for indoor storage and still some equipment should be stored under controlled temperature and humidity , for example,  electrical equipment, electrical dashboards and the like.

Packages normally have desiccants to reduce the moisture level that could corrode the components  while Some equipment are shrink wrapped to avoid corrosion and ingress of contaminants.

Some equipment is added with anti corrosive agents for protecting internals; spools and flanges may be protected by oil and protected by a cap to avoid damages to the flange face.

Equipment shall be secured within the packaging.

Lifting lugs shall be clearly marked.  Directional arrow on the box shows the side package shall rest upward.

IOM and storage procedure shall be part of the dispatch dossier.

Equipment shall have a designated storage area within the site and shall not be frequently moved around until installed.

Installation, Operation and Maintenance Manual (IOM):

IOM constitutes part of the shipping document used for installation and operation as the name suggests. IOM also lists the volume and number of consumables such as bolts, gaskets, oil, etc that is needed for installation, operation and periodic check, servicing and maintenance.

 

Pre Commissioning & Commissioning:

Before the equipment become fully operational, it needs to be pre commissioned to see whether it is in working order and then commissioned together with a series of other equipment to see whether the whole group of equipment works in unison satisfactorily.

All these activities have a sequence of activities that should be followed (ITP) and a number of checklists that need to be ticked before the equipment is declared safe (mechanical completion) in order to initiate pre-commissioning and commissioning.

 

Subscribe To Our Newsletter

Get updates and learn from the best

More To Explore

Audit & Assessment
QA QC tips

Audit & Assessment

Depending on the criticality and complexity of the materials & equipment being procured, CLIENT and their assigned representatives may conduct out a pre-award audit or assessment of CONTRACTOR & VENDOR and any intended lower-tier- Supply Chain prior to the award

pim-ppm
QA QC tips

Pre-production or Pre-Inspection Meeting (PPM or PIM)

Normally, 2-4 weeks after the kick off meeting or 2 weeks after submission of critical quality documents, the pre production meeting is held. It is advisable to hold the PIM after one cycle of critical document turnaround in order to

Do You Want To Boost Your knowledge?

See our Coursses