Continuous Improvement: At the completion of the inspection activities; a PDCA cycle (plan, do, check, act) review is taken as part of a continuous improvement program to determine which activities went well and where improvements should be made. Any …
It is the maximum gauge pressure at the top of a pressure vessel allowed by design or code calculations for a set temperature. When the working temperature decreases or significantly increases, material strength is reduced and therefore the pressure …
CONTRACTOR shall prepare the MRB that contains all the relevant certificates, test reports, drawings, calculations relating to the CONTRACT as per vendor document requirement list (VDRL). The format and content of Manufacturing Record Book shall be in …