1. 𝙑𝙚𝙧𝙞𝙛𝙮 𝙒𝙋𝙎 parameters within welding range Ensure WPS takes into account actual pipe grade/thickness, base and filler metals. 2. 𝙌𝙪𝙖𝙡𝙞𝙛𝙮 𝙒𝙚𝙡𝙙𝙚𝙧𝙨 𝙛𝙤𝙧 𝙋𝙞𝙥𝙚 𝙋𝙤𝙨𝙞𝙩𝙞𝙤𝙣𝙨 𝙉𝙚𝙚𝙙𝙚𝙙 Validate Welder Performance Qualification (WPQ) performed on the actual pipe welding positions that will …
https://static.inspector-training.com/uploads/2023/06/How-heat-exchanger-works.mp4
https://static.inspector-training.com/uploads/2023/06/Pump-Shaft-Alignment.mp4
https://static.inspector-training.com/uploads/2023/06/how-centrifugal-pumps-work.mp4
Beginning 2023, ICP will include Continuing Professional Development (CPD) hours, as part of new recertification requirements for API 510, API 570, and API 653. The new CPD requirements are in addition to existing recertification requirements for continued inspection …
Examination specifically means QC activities such as an NDT activity. It is not an inspection. Inspection means verifying a QC activity by either witnessing it or repeating the QC activity. The closest analogy could be the difference …
Continuous Improvement: At the completion of the inspection activities; a PDCA cycle (plan, do, check, act) review is taken as part of a continuous improvement program to determine which activities went well and where improvements should be made. Any …
It is the maximum gauge pressure at the top of a pressure vessel allowed by design or code calculations for a set temperature. When the working temperature decreases or significantly increases, material strength is reduced and therefore the pressure …
CONTRACTOR shall prepare the MRB that contains all the relevant certificates, test reports, drawings, calculations relating to the CONTRACT as per vendor document requirement list (VDRL). The format and content of Manufacturing Record Book shall be in …