Criticality Rating Of Packages
[vc_separator style=”shadow” border_width=”7″] Click below Study our free lessons and quiz: [vc_separator style=”shadow” border_width=”7″]
Audit & Assessment
Depending on the criticality and complexity of the materials & equipment being procured, CLIENT and their assigned representatives may conduct […]
Quality Plan
Project Quality Plan (PQP) is normally required for criticality “1” packages. It is based on ISO 10005 Quality management — […]
Inspection Status Report
ISR can be based on Procurement status report (PSR) with focus on inspection. ISR is updated and turned around […]
Procurement Status Report (PSR)
It is a good practice to have a PSR that acts as a dashboard for procurement and fabrication activities updated […]
Criticality rating of packages
Each package is assigned a criticality rating; ranging from 1 through 4, with criticality ‘’1’’ being the highest. There […]
QA QC & Inspection Management of Packages
Since we are talking about the management aspect of quality assurance, quality control and inspection, the basic rules remain the […]
Pre-Bid Documents
Before we start preparing the pre-bid paperwork for packages, let us examine the essential ingredient for pre-bid document. A […]
Pre Commissioning & Commissioning
Before the equipment become fully operational, it needs to be pre commissioned to see whether it is in working order […]
Installation, Operation and Maintenance Manual (IOM)
Installation, Operation and Maintenance Manual (IOM): IOM constitutes part of the shipping document used for installation and operation […]