Kick Off meeting
Kick Off meeting: Normally 4 weeks after placement of order or 2 weeks after submitting the critical documents, a kick...
Read Article →INSIGHTS & RESOURCES
Practical guidance for API certification, exam preparation and inspection professionals.
Kick Off meeting: Normally 4 weeks after placement of order or 2 weeks after submitting the critical documents, a kick...
Read Article →
Inspector Duties: The manufacturer/fabricator is responsible for the quality of all their Manufactured and & Fabricated products, which includes not ...
Read Article →
Inspection reports shall be written on a template in order to standardize the reporting system. Such form normally has sections...
Read Article →
Short listed bidders are invited for a face to face meeting with the client called clarification meeting or pre-purchase meeting...
Read Article →
[vc_row][vc_column][vc_column_text] Inspection Management: There are many factors to consider when managing inspection activities whether for a single package or...
Read Article →
Metallurgy In this module you shall learn about: Structure of Metals and Alloys Physical and mechanical Properties Preheating and...
Read Article →
ASME Section II is divided into four parts covering the materials for the construction of piping and pressure vessels. Part...
Read Article →
Punch list: In theory, we expect to have a perfect package ready to be released but in reality, that is...
Read Article →
Inspection and test Plan (ITP): ITP is also called Quality Control Plan (QCP) but should not be mistaken with Project...
Read Article →Explore our API, NDT and CPD training courses.