Supplier Selection
The bidders are short listed based on fulfilling the quality and certification requirements, acceptable engineering proposal, cost and […]
Quality Surveillance
Prior to commencement of the quality surveillance as per Inspection and test plan (ITP) intervention points, the inspector […]
QA QC & Inspection Management of Packages
Since we are talking about the management aspect of quality assurance, quality control and inspection, the basic rules remain […]
Project Quality Plan (PQP)
Project Quality Plan (PQP) is normally required for criticality “1” packages. It is based on ISO 10000 5 Quality management […]
Quality Status Report (QSR)
QSR can be based on Procurement status report (PSR) with focus on inspection. QSR is updated and turned […]
Procurement Status Report (PSR)
It is a good practice to have a PSR used as a dashboard for procurement and fabrication activities. PSR […]
Preparing bid document
Before we start preparing the paperwork for packages, let us examine the essential ingredient for bid document. A Package […]
Pre-Bid Documents
Consists of general terms and conditions, data sheet and applicable relevant project specification. Data sheet is one of […]
Pre-Inspection Meeting (PIM)
PIM also called Pre-production Meeting (PPM) is normally held , 2-4 weeks after the kick off meeting or 2 […]
Packing & storage
[vc_row][vc_column][vc_column_text] Fixed equipment is normally packed for outdoor storage for one year or as agreed with the purchaser. Rotating […]