CPD Accredited Provider ◆ 100% Online & Self-Paced ◆ Trusted by inspectors in 70+ countries

Management of Change (MOC)

    Management of Change (MOC) is a systematic approach dealing with the proposed changes and it’s effect on other […]

Kick Off Meeting (KOM)

  Normally 4 weeks after placement of purchase order or 2 weeks after submitting the critical documents, a kick off […]

Inspector Duties

    The  manufacturer is  responsible  for  the  quality  of   their  products,  which includes  not  only  good  workmanship,  but  also  […]

Inspection Report

    Inspection Report shall be written on a template in order to standardize the reporting system. Inspection report normally […]

Inspection of Material

  Means confirming  that  the  construction  materials  proposed  are  the  actual  materials  used  during construction is a typical inspection activity. […]

Inspection Management

    Prepare a master Inspection register where each package is assigned an excel page named after the package and […]

Inspection Coordination

  For each assignment, prepare an inspection pack that as a minimum would consist of: Notification of Inspection (NOI), Purchase […]

Dispatch Dossier

    For less complex packages such as bulk materials and off the shelf components, we need very few documents […]