Order of Precedence for Reference Documents

Share This Post

 

The supplier shall adhere to the instructions and reference documents included in the purchase order.

 

In case of discrepancy between reference documents, normally, the following order of precedence is observed:

  1. Contract, Specific Conditions
  2. Contract, General Conditions
  3. Basis of Design (B O D)
  4. Documents that require deviation to be approved by Client including Design Criteria, Philosophies, PFDs, Plot Plans
  5. Documents that require deviation to be approved by Principal Contractor including Specifications,  drawings.

Click below Study our free lessons and quiz:

Subscribe To Our Newsletter

Get updates and learn from the best

More To Explore

Pro Tip for Non Conformity Report (NCR)

A Non-Conformance Report (NCR) is a formal quality control document that plays a vital role in recording, identifying, and addressing instances where products, materials, or processes do not meet applicable procedures, acceptance criteria, specifications, codes, standards, or contractual requirements. [/vc_column_text][/vc_column][/vc_row]

ITP & ITR

Inspection and Test Plans (ITPs) and Inspection and Test Records (ITRs) are essential quality documents in construction and manufacturing. [/vc_column_text][/vc_column][/vc_row]

Do You Want To Boost Your knowledge?

See our Coursses