Normally, client forms a team for each package.

The focal point for each package is the package engineer who may seek assistance from other engineering disciplines such as electrical, process, mechanical, material, welding, NDE and coating as and when needed.

The package engineer is supported by ‘’procurement’’ department (buyer) and ‘’Quality’’ Department (Quality Engineer or supplier quality surveillance (SQS)) as permanent team members.

The buyer identifies potential manufacturer/supplier/vendor or choose from the approved vendor list (AVL).

The vendors from AVL are those who have been screened before and short listed and approved or vendors who have previously worked for the client and their performance were satisfactory.

Pre-bid documents is compiled by the buyer and reviewed by the package  and quality engineers.

 

Subscribe To Our Newsletter

Get updates and learn from the best

More To Explore

Difference between Codes & Recommended Practices (RP)

Codes are mandatory. It is mandated by jurisdiction or the project. You can not violate or ignore a code requirement else, you are not complying with the code. For example, if a pressure vessel is built and stamped as per

Electorde polarity

When butt welding a pipeline, achieving strenght weld is crucial, a weldment with good penetration. To ensure this, connecting the electrode to the negative pole is essential. This setup generates more heat at the base metal, reducing electrode burn rate

Do You Want To Boost Your knowledge?

See our Coursses